Buying a system with a ten-year operating life means making a cryptographic decision today. The same applies to applications that hold sensitive information for years, equipment that verifies signed firmware and services that depend on an external provider’s upgrade path.
Post-quantum cryptography, or PQC, gives teams new algorithms designed to resist attacks from a cryptographically capable quantum computer. Preparing for the transition means finding where the organisation relies on cryptography and working out how those uses can change without losing the service.
Some standards are already final
NIST published its first three principal PQC standards in August 2024. They cover different security functions. NIST’s current programme summary also identifies further algorithms undergoing standardisation.
| Standard | Function | Status |
|---|---|---|
| FIPS 203 ML-KEM | Key establishment | Final |
| FIPS 204 ML-DSA | Digital signatures | Final |
| FIPS 205 SLH-DSA | Digital signatures | Final |
Falcon, a digital signature algorithm, and HQC, a key-encapsulation mechanism, are in NIST’s ongoing standardisation work. Their selection has a different status from a published final standard.
For an operating team, an approved algorithm is one dependency. The application, protocol, libraries, key storage and communicating peers also need compatible implementations. Ask a supplier to identify the supported function and release behind a claim of “PQC ready”.
Plan around information life and system life
Attackers may retain encrypted information for decryption later. Data that needs long-term confidentiality therefore deserves attention before a cryptographically capable quantum computer exists. ASD’s planning guidance also highlights migration lead times and difficult-to-update systems.
For organisations applying the Australian Information Security Manual, that guidance recommends a refined transition plan by the end of 2026, commencement with priority systems by the end of 2028 and completion by the end of 2030. Use the policy and contractual requirements that apply to your environment when setting dates.
Bring this into procurement and refresh planning. A supplier’s supported operating life should include a credible path for cryptographic changes, with the dependencies, costs and responsibility for implementation made clear.
Inventory the use, then trace the dependency
For each cryptographic use, establish how long its protection must last and how it can change. The implementation version and upgrade path matter as much as the algorithm name.
Include dependencies that procurement can overlook: firmware verification keys, private certificate authorities and external services whose upgrade schedule you do not control. A system can support a new algorithm while one of those dependencies prevents its use.
For outsourced services, the contract owner needs a supported answer from the supplier. For industrial equipment, establish how embedded verification keys can change before assuming that a firmware update will be enough.
Turn supplier claims into a change plan
Ask for the specific algorithm, security function, protocol and supported software or hardware release. Confirm whether the capability is available, under test or on a roadmap. A promised date belongs in the dependency register with an owner who will follow it up.
Work through the whole connection: which peer versions interoperate, where keys are generated and held, how certificates or trust stores change, and whether an appliance or cryptographic module needs replacement. Agree what happens when a peer cannot negotiate the intended protection.
Include licensing, maintenance windows and support arrangements. Those details determine whether the team can complete the migration within a normal change programme or needs a separate delivery plan.
Test the service you intend to operate
Choose a supported implementation and a representative environment. Measure connection establishment, processing load and behaviour over the actual network path. Include constrained links, larger messages, reconnect storms and failover where they matter to the service.
Exercise old and new peers together. Confirm the negotiated protection and detect an unexpected fallback. Test certificate renewal, key replacement and recovery with the people who will support the service.
For OT, involve the equipment supplier and operations team in the acceptance conditions. Preserve control behaviour and recovery access through the transition. Plan the live change around an agreed operating window and stop conditions.
What the next refresh needs to include
The next purchase or renewal should identify the supported upgrade path, its cost and the party responsible for implementing it. Where support depends on a future release, carry that dependency into the contract and the funded change plan.
Existing equipment may need an interim treatment while replacement is planned. Keep that decision visible in the refresh programme, alongside the tests needed before the new capability enters service.
Practical certificate automation covers the deployment and verification discipline that supports this work. Changing algorithms will require additional compatibility and performance testing.